THE ORDO7 BLOG
Schedule health, explained without the jargon.
Practical writing for the people who own construction schedules — no PSP certification required.
FEATURED
DCMA & compliance
How to Fix Negative Float in Primavera P6 (Before It Fixes Your Finish Date for You)
Negative float in P6 means your schedule can't hit its finish date as currently logic-driven. Here's why it shows up, how to find it, and how to fix it.
SCHEDULE NETWORK
15 posts · live logic map
MORE FROM THE BLOG
FOUNDER LOG
A Lead Is a Lie Your Schedule's Logic Is Telling You
The second of the DCMA's 14 checks flags something most schedulers have used without naming: an activity starting before its predecessor is actually done. Here's why DCMA wants leads at zero.
FOUNDER LOG
Manufacturing's Capital Boom, Seen From the Inside
Data centers and manufacturing plants are surging right now — and the project controls function meant to run them hasn't scaled to match. A firsthand look at what that stretch actually looks like.
FOUNDER LOG
Improving Baseline Accuracy 17%, One Portfolio at a Time
On a $1M–$25M energy project portfolio, disciplined schedule logic and milestone placement improved baseline accuracy by 17%. Here's what that actually took.
DCMA
Your Schedule Says This Can't Start Yet. The Field Already Did It Anyway.
Out-of-sequence progress means an activity was reported started before its Finish-to-Start predecessor actually finished. Here's why it happens in P6, how it skews float, and how to fix it.
DCMA
What Is a Schedule Health Score? (And Why One Number Actually Helps)
A schedule health score is a 0-100 number built from real DCMA-style checks on your P6 or MS Project file. Here's exactly what it measures, dimension by dimension.
DCMA
An Open End Won't Slow Down. It'll Just Stop Reporting.
An open end in a P6 schedule is an activity with no predecessor or successor. Here's why it breaks float and the critical path, and how to find and fix it.
DCMA
The DCMA 14-Point Check, Explained Without the Jargon
The DCMA 14-point check, explained: all 14 official metrics, real thresholds, and which ones Ordo7 automates today, sourced from DCMA's own standard.
FOUNDER LOG
Why Ordo7 Will Never Fabricate a Metric It Can't Compute
Self-reported schedule quality and objectively measured schedule quality are two different things. Here's why Ordo7 only ever shows a number it can actually back up, and marks the rest unavailable instead of guessing.
FOUNDER LOG
An Activity With No Predecessor Isn't a Schedule, It's a Guess
The first of the DCMA's 14 schedule-health checks is also the simplest: every activity needs something driving it and something depending on it. Here's why that rule catches so much.
FOUNDER LOG
In Utility Work, a Missed Schedule Isn't Just Late. It's a Safety Problem.
Compliance-driven maintenance schedules don't get extensions. A look back at a water utility program where enforcing schedule discipline cut safety incidents by 9%.
FOUNDER LOG
Eight Years in Project Controls Taught Me One Thing Keeps Breaking
PMP-certified, deep in Primavera P6 and EVM, across $100M+ in portfolios and five industries. The tools were always powerful. They were never built for the person actually running the schedule.
FOUNDER LOG
No Big Team. No Funding Round. Just the Work, in Public.
Building in public isn't a growth tactic here — it's the only way I know how to build something honest. Here's why the Founder Log exists, and what 'follow the journey' actually means right now.
FOUNDER LOG
There Aren't Enough Project Controls Analysts. Everyone Feels It.
A capital-projects boom is outpacing the supply of trained project controls talent — and the gap doesn't disappear, it gets absorbed by whoever's already on the project. Usually the PM.
FOR OWNERS
The Non-Scheduler's Survival Guide: 5 Red Flags to Check Before You Accept a Contractor's Baseline
You don't need a PSP certification to catch a bad baseline. Here are 5 concrete things to check in a contractor's schedule before you sign off — and why each one matters.